Classified listing

What are the best features of Agra Etawah Toll Road Project

Browse listing photos, review the details and contact the seller directly.

Photos

See the listing images below.

No photos were provided for this listing.

Description

Seller-provided details for this listing.

The NHAI and AETPL (AE Tollway Private Limited) (a Concessionaire), an SPV of IRB Infrastructure Developers Ltd., signed a Concession Agreement on September 1, 2015 to build, operate, and maintain the Agra Etawah Bypass NH 2 Project. The Project's franchise season is still a long way off from the Appointed Date. During this time, the concessionaire is permitted to collect the entire consumer cost from road customers.

https://www.youtube.com/watch?v=DucTK7ejEg0