Classified listing

What are the best features of Agra Etawah Toll Road Project

Photos

No photos were provided for this listing.

Description

Seller-provided details for this listing.

The NHAI and AETPL (AE Tollway Private Limited) (a Concessionaire), an SPV of IRB Infrastructure Developers Ltd., signed a Concession Agreement on September 1, 2015 to build, operate, and maintain the Agra Etawah Bypass NH 2 Project. The Project's franchise season is still a long way off from the Appointed Date. During this time, the concessionaire is permitted to collect the entire consumer cost from road customers.

https://www.youtube.com/watch?v=DucTK7ejEg0